Nepal: South Asia Subregional Economic Cooperation Power Transmission and Distribution System Strengthening Project
This loan and grant project will complete the reinforcement and modernization of the power supply system in and around Kathmandu in Bagmati Province, Nepal. This project will begin strengthening distribution systems outside of Kathmandu in a systematic and phased manner, starting with the Bharatpur metropolitan area of Chitwan district in Bagmati Province and Pokhara of Kaski district in Gandaki Province, where supply interruptions are frequent and prolonged. The project will also support Province 2, where the quality of electricity supply is poor and about 20% of households are still without access to the national grid. Further, the project will strengthen transmission lines for evacuation of hydropower to the main load center, Kathmandu, and other load centers, while excess power is traded with neighboring countries.
PROJECT DETAILS | ||
Commitment Date Funding Type Country Sector Status Total Cost |
27 Aug 2020 Loan/Grant Nepal Energy Ongoing $322 million |
KEY OUTPUTS |
Increased power system transmission capacity System losses reduced to 25% in Province 2 (2017 baseline: 31.3%) Annual per capita electricity consumption in Nepal increased to 700 kWh by 2028 (2018 baseline: 198 kWh) |
FINANCING |
$87 million (Government of Nepal) $35 million (Government of Norway) $200 million (Asian Development Fund) |